The client identified a need to upgrade their crane, due to experiencing increased downtime issues. This was effecting
productivity. The current control system installed was obsolete leaving the customer with legislation, breakdown, spare parts and
operational issues.
ALATAS APPROACH
Alatas UK inspected the crane and offered an upgrade package for the control system, that would resolve their current downtime issues and resolve future maintenace.
ALATAS SOLUTION
Increase control of the current power pack
Ensure future maintainace of the crane is possible
Ergonomically bespoke cabin designed to requirements
Ensure time frames were met
Offer a competitive package and service support
WORK PROCESS
FAT conducted at Alatas workshop. This was a build-up
and demonstration of the system
Installation of upgrade on the rig
Alatas also carried out a full critical load path NDT Inspection of the crane
Alatas in-house crane design team created the repair procedures
The system was commissioned and a SAT was completed
Deployed a purpose built hydraulic workshop container
The load test was carried out
ALATAS ADVANTAGE
System was capable of controlling the current power pack providing a huge cost saving for our client
Alatas could offer service exchange parts for the current power pack even though the OEM classes it as obsolete
Custom built control cabin (ergonomically designed)