Content on this page requires a newer version of Adobe Flash Player.
Chinese site
Alatas Middle East - Replacement of LICCON Crane Control System
Alatas Germany and Middle East have been awarded with the replacement of the LICCON Crane Control System with an ALATAS Crane Control System for eight ship board cranes. The focus was put towards keeping the maximum of the existing hardware and adapt it to the new system. This was successful except for the joysticks and the input panel. All sensors and actuators could remain as original. The project execution was to a vast majority done at voyage between the ports the corresponding vessel was calling. The scope of supply included the following.
New HMI, CPU, I/O Modules
New Controllers
Alteration of Control Switch Cabinet
Update of Crane Manuals
The subject project was an additional success for the Alatas Crane Control System which can be adapted to any kind of crane application in safe and zone rated envrionments. Please send your requriement to the nearest Alatas office of your base or to dubai@alatas.ae .
Renewed cables and plugs for all solenoid valves (13pcs)
Installed new control system
Installed new solenoid relays
Fitted and assembled new joysticks
Fitted and assembled new joysticks
Load test with 43 ton to check power limitation and to
adjust overload protection