Hoist Winch Gearbox Failure on Tsuji Deck Crane

 

The vessel is a container feeder vessel equipped with Tsuji Deck cranes, type SSCHS4525-T1 with a lifting capacity of SWL 45t at 28m and 40T at 25m radius. Crane 2 developed a hoisting problem and ALATAS Tsuji Crane Specialist went on board to investigate. It was determined that the planetary gearbox had seized, and the gearbox needed to be removed from the crane and sent to Alatas Engineering workshop for strip down and inspection.

The hoisting winch gearbox is a planetary gearbox, make Sumitomo ComPower, type CPHFL-160A-QS-67A, drawing Nr. KHA760G. As it turned the gears were found completely smashed and a new gearbox had to be procured and installed. (download inspection report here)

Alatas mobilized engineers, tools & rigging equipment to remove the damaged rope winch gearbox from the crane and installed the new gearbox. The job to remove the hoisting winch is a large job and needed careful planning, mainly because of the hoisting which is located underneath the luffing winch frame and it is further complicated because of the very limited space inside the crane house. Also, considerations had to be made on how to lift the gearbox down to deck from the high up crane maintenance hatch.

Vessel

Rigging gear

Vessel

Stinger sheave block prior to removal

Jacking counter frame bearing

Narrow space in crane machine house

Jacking counter frame bearing

Narrow space in crane machine house

Working in confined space

Removing hoisting brake unit

Working in confined space

Removing hoisting brake unit

Separating gearbox from rope drum

Separating gearbox from rope drum

Separating gearbox from rope drum

Separating gearbox from rope drum

Remove hoisting wire rope

Removing gearbox out of maintenance hatch

Remove hoisting wire rope

Removing gearbox out of maintenance hatch

Lifting gearbox out of crane

Lifting gearbox out of crane

Lifting gearbox out of crane

Lifting gearbox out of crane

Rigging of hoist winch

Winch drum removed from frame

Rigging of hoist winch

Winch drum removed from frame

Narrow space in crane machine house

Planetary gearbox to be opened for inspection

Rigging of hoist winch

Planetary gearbox to be opened for inspection

Opened planetary gearbox - smashed teeth

Planetary gearbox dismantling in progress

Opened planetary gearbox - smashed teeth

Planetary gearbox dismantling in progress

Planetary gearbox -dismantled parts

Opened planetary gearbox - smashed teeth

Planetary gearbox -dismantled parts

Opened planetary gearbox - smashed teeth

Opened planetary gearbox - smashed teeth

Opened planetary gearbox - smashed teeth

Opened planetary gearbox - smashed teeth

Opened planetary gearbox - smashed teeth

Opened planetary gearbox - smashed teeth

 

Opened planetary gearbox - smashed teeth

 

 
 
Download

 

 
 
 
Alatas Latest News
ILO 152 renewal and certification
Inspections and ILO 152 certification
details...
Crane cabin replacement
Crane cabin replacement and general repairs
details...
Liebherr crane luffing cylinder repairs
Liebherr CBW crane luffing cylinder replacements
details...
Crane control system
Ship crane control system replacement
details...
Hose replacement
Hydraulic hose renewal on Liebherr offshore cranes
details...
Crane bumper bars protect lattice boom crane from hook strikes
Crane bumper bars protect lattice crane booms
details...
Dock crane
Critical Dock Crane slew bearing repairs
details...
Hagglund crane
MacGreor Hagglunds Gl2524-2 slew bearing replacementl
details...
MacGregor crane rope sheave changeout
MacGregor crane rope sheave changeout
details...
Searex crane
Commissioning of 210 tons Searex Omnilift Offshore Crane
details...
 
 
 
Alatas Offices & Service Stations
Alatas UK Ltd - Head Office
Unit B, Olympic Park, Low Moor,
Bradford BD12 0LP
Tel: +44 1274 699222
Fax: +44 1274 699215
26 Abercrombie Court, Prospect Road, Arnhall Business Park, Westhill, Aberdeenshire AB32 6FE
Tel: +44 1224 797232
Houston Office, 22015, South Frwy.
Manvel, Texas 77578 USA
Tel: +1 281 431 0707
Fax: +1 281 431 0799
Riedemannstr. 2, 28239 Bremen
Germany
Tel: +49 421 / 61 94 184-0
Fax: +49 421 / 61941845
2203 Winning Centre, 29 Tai Yau Street, San Po Kong, Kowloon, Hong Kong
Tel: +852 2153 2153
Fax: +852 2153 2163
Carretera Carmen-Puerto Real Km. 14.5
Cd. Del Carmen, Campeche. México, C.P. 24157
Tel: +52 (938) 68 8 52 60
Fax: +52 938 110 6823
Jebel Ali Free Zone - South, P.O. Box 263 007
Dubai United Arab Emirates
Tel: +971 4 885 7954
Fax: +971 4 885 7229
Kjøita 6, 4630 Kristiansand,
Norway
Tel: +47 977 48345
Fax: +47 976 48345
C/O: Houston Office, 22015, South Frwy.
Manvel, Texas 77578 USA
Tel: +1 281 431 0707
Fax: +1 281 431 0799
1 Int'l Business Park #03-01E
The Synergy, Singapore 609917
Tel: +65 6861 2336
Fax: +65 6861 6261
Recapital Buiding 5th Floor, Jalan Adityawarman Kav.55, Kebayoran Baru, Jakarta Selatan, 12160
Tel: +62 21 7247679
Fax: +65 6861 6261
No. 51, Lane 3226, Humin Road, Minhang District, Shanghai 201108
Tel: +86 (021) 6296 6612
Alatas on Facebook Follow Alatas on Twitter Follow Alatas on Google Plus Alatas You Tube Channel Alatsa Linkedin Share

© 2018 Alatas Worldwide Group | Privacy Policy

 

  You are here: Home > News > Boom hinge repairs on Kawasaki deck cranes