| ALATAS’ SERVICE | FIELD SERVICE / PARTS SUPPLY / ENGINEERING |
| LOCATION | UNITED KINGDOM / NORTH SEA (UK SECTOR) |
| EQUIPMENT | MOORING WINDLASS |
| BRAND / MODEL | PUSNES / PUSNES 30184 |
BACKGROUND
The project involved the replacement of the brake bands and hydraulic cylinder on Mooring Windlass #7B for an offshore client. The overall plan is to replace all ten (10) windlass brake systems. This scope represented the second replacement out of the planned ten and was completed successfully within the defined work scope.
Before work commenced, a brake test was conducted on Windlass #7A and witnessed by Alatas to confirm that the system could securely hold the chain without slippage. The brake band on Windlass #7A was adjusted to hold 155 tonnes, allowing the safe replacement of Brake Band #7B.
All mechanical work was completed as planned; however, a full functional test could not be performed due to a power supply issue on the asset.
During dismantling, several pins were found to be seized and could not be removed using standard pin-pulling tools or pancake jacks. Due to the severity of the seizure, the pins were cut using a Spitznas saw by a third-party machinist. The cutting process took several hours because the pins were manufactured from hardened steel. All seized pins were successfully removed, and the work progressed according to plan.
ALATAS’ SOLUTION
The project was executed by a multidisciplinary team consisting of a Project Engineer, Senior Service Technician, Service Technicians, Hydraulic Technician, L3 Rigger, and a third-party machinist. The team applied controlled mechanical dismantling, precision cutting of seized components, and structured reinstallation procedures to ensure safe and effective completion of the brake band replacement.
Job scope
• Dismantling of hydraulic cylinder
• Dismantling of upper brake band
• Dismantling of lower brake band
• Removal of load pin
• Installation of lower brake band
• Installation of upper brake band
• Installation of load pin
• Installation of hydraulic cylinder
• Functional testing
• Readjustments
• Corrective work order checks
• Preplanning for brake band replacement on Windlass #4
Alatas carried out a Brake Band Replacement on Pusnes Windlass Aboard an FPSO