ALATAS’ SERVICEFIELD SERVICE  / ENGINEERING
LOCATION  AMERICAS / USA / PANAMA CITY, FLORIDA
EQUIPMENT  SHIP YARD  / CONSTRUCTION CRANES
BRAND / MODELAMERICAN 1400

INTRO

A precision engineering operation has been successfully completed, during which maintenance teams replaced the slew bearing on an American 1400 crane — a critical component that enables smooth rotation of the crane’s upper structure. The complex procedure, carried out by carefully jacking the crane’s upperworks, marks a significant milestone in the shipyard’s ongoing heavy-lift equipment maintenance program. This operation required meticulous planning, coordination, and safety control measures to ensure the massive crane was stabilized and restored to full operational capacity with minimal disruption to shipyard activities.


BACKGROUND

During scheduled maintenance inspections of the American 1400 crane, the slew bearing was found to be beyond its acceptable tilt clearance limits, indicating excessive wear and loss of structural integrity. Detailed measurements confirmed that the bearing could no longer operate within safe tolerances, necessitating its replacement.

Following this assessment, a new slew bearing and associated slew studs were procured to ensure full compatibility with the crane’s upper and lower structures. Engineering teams subsequently developed a detailed jacking and change-out procedure to safely lift and support the crane’s upperworks during removal and installation. The procedure emphasized precise load distribution, structural stability, and strict adherence to safety protocols. This operation restored the crane’s rotational accuracy, reliability, and long-term operational performance.


SOLUTION

To address the excessive tilt clearance and wear identified on the American 1400 crane’s slew bearing, ALATAS engineered a comprehensive jacking and replacement solution tailored to the shipyard’s operational environment and ground conditions.

The operation required extensive structural and mechanical engineering to safely support and elevate the crane’s upper structure. ALATAS developed a custom jacking arrangement designed to evenly distribute the crane’s weight through a series of precision-engineered support frames and load-spreading mats, ensuring ground bearing pressures remained within acceptable limits.

Once the crane’s upperworks were securely jacked and stabilized, the worn slew bearing was carefully removed using guided alignment systems to prevent damage to the mating surfaces. The new slew bearing and slew studs were then installed in strict accordance with manufacturer tolerances and torque specifications.

Throughout the operation, ALATAS engineers provided continuous structural monitoring, load verification, and quality assurance to ensure all lifting and alignment stages were executed safely and accurately. The project was completed efficiently, restoring the crane’s full slew function and operational reliability while minimizing downtime within the shipyard’s lifting operations.


JOB SCOPE

1. Project Overview

ALATAS was contracted to provide a complete turnkey solution for the replacement of the slew bearing on an American 1400 crane located in Panama City, FL. The project involved the procurement, engineering, fabrication, installation, and commissioning of a new slew bearing system, including all associated fasteners and jacking equipment.

This complex operation required extensive engineering analysis, bespoke system design, and precision execution to ensure the safe and efficient replacement of the slew bearing while maintaining full compliance with safety and quality standards.

2. Objectives

  • Replace the existing slew bearing that had exceeded allowable tilt clearance limits.
  • Design and implement a safe and controlled jacking system to lift and support the crane’s upper structure.
  • Ensure the new bearing installation met all dimensional, structural, and torque specifications.
  • Deliver a full turnkey solution — from engineering through to final load testing and recertification.

3. Detailed Scope of Work

3.1 Procurement and Quality Control

  • Procured a new slew bearing assembly complete with new slew fasteners.
  • Conducted comprehensive Quality Control (QC) inspections in accordance with the Inspection and Test Plan (ITP).
  • Verified manufacturer compliance, dimensional accuracy, and material certifications prior to dispatch.

3.2 Engineering and Design

  • Developed a complete jacking system design tailored to the American 1400 crane configuration.
  • Performed full Finite Element Analysis (FEA) of the crane’s pile caps and upper structure to verify load paths and confirm that the jacking points could safely sustain the required loads.
  • Produced detailed fabrication and production drawings for the jacking system and supporting frames.
  • Engineered the bearing slide-out and installation system to allow precise removal and insertion of the slew bearing.

3.3 Fabrication and Manufacturing

  • Fabricated and assembled bespoke jacking frames and load-distribution components in accordance with ALATAS engineering specifications.
  • Conducted fit-up checks and functional testing of the system prior to site deployment.

3.4 Site Installation and Jacking Operations

  • Mobilized ALATAS engineering and technical crews to the site for installation of the jacking system.
  • Installed the jacking frames and verified the alignment and stability of all components.
  • Removed one counterweight and safely laid down the crane boom to prepare for the lift.
  • Utilized a specialized jacking control system capable of real-time monitoring of hydraulic pressure, jack height, and load at each jacking point.
  • Elevated the upper structure to allow access to the slew bearing interface.

3.5 Bearing Replacement

  • Executed the removal of the worn slew bearing using ALATAS’s custom-engineered bearing slide-out system.
  • Installed the new slew bearing, ensuring precise alignment between upper and lower structures.
  • Applied and verified all bolt tensioning in accordance with engineered torque and clamping force specifications.
  • Lowered the crane upper structure and completed installation of all slew studs and fasteners.

3.6 Commissioning and Testing

  • Conducted full functional tests of the crane slew system to confirm operational integrity.
  • Performed load testing as per recertification requirements to validate the crane’s rated capacity and slew performance.
  • Compiled and submitted a complete documentation package, including QC records, load test reports, and engineering certifications.

5. Outcome

ALATAS successfully delivered the project on time, within scope, and without incident — demonstrating the company’s capability in executing complex, high-risk, bespoke heavy-engineering operations. The project restored the crane to full operational condition, ensuring long-term reliability and safe performance.

Scroll to Top