Introduction

Alatas UK was requested to carry out a brake band changeout on the Maritime Pusnes Brake Band system.

Background

The client required Alatas to devise a solution for replacing the brake band assemblies onboard the asset due to their poor condition.

Alatas’ Solution

Alatas executed the brake band changeout in a structured process, beginning with preparatory work that included developing a lifting plan, rigging specifications, and associated sketches for multiple component changeouts on the designated unit. The team also designed and prepared drawings for pin removal kits (seven pins/arrangements) and modeled the main framework in its original condition as a precautionary measure pending NDT results. Workpacks and detailed method statements were prepared to guide the operation. During the changeout process, the team dismantled the band brake, hydraulic cylinder, upper band brake, and lower band brake. These components were then systematically reinstalled, including the band brake, lower and upper band brakes, and hydraulic cylinder, ensuring operational integrity and compliance with safety standards.

Job Scope

  • Replaced the brake band and hydraulic cylinder on the mooring windlass 10A.
  • Addressed and resolved the following challenges during the project:
    • Incorrect Cylinder Spare:
      • The new hydraulic cylinder could not be installed due to incorrect lug positions.
      • The old cylinder was reinstalled to prepare for the vessel’s upcoming shutdown.
    • HPU Filter Replacement:
      • The filter could not be replaced because the client-provided spare was incorrect.
      • The system could not be flushed or function tested.
    • Brake Band Joining Pins:
      • Joining pins could not be pulled or line bored due to limited access.
      • Old pins were cut out using a Spitznas saw, and new pins onboard were installed.
    • Clamps for Lift Plan:
      • Incorrect clamps (S2A) were supplied instead of the specified USC2 clamps.
      • USC3A clamps were shipped offshore, and their suitability was confirmed by the Alatas design team before use.
    • Lower Brake Band Removal:
      • The load cell bracket was seized, preventing the removal of the lower brake band.
      • The bracket was cut after discussions with the bargemaster, freeing the lower brake band.
      • Further issues arose as the lower brake band could not pass the load cell bracket.
      • The load cell and remaining bracket parts were removed using a 60-ton pancake jack, allowing the rigging team to successfully remove the lower brake band.