Butterley 15T Crane Winch & Slew Drive Reliability Upgrades

Overview

Alatas was engaged to carry out a series of mechanical reliability upgrades and component replacements across multiple Butterley 15T grab cranes operating in a demanding bulk-handling environment. The works focused on restoring critical drive systems, improving slewing performance, and reducing the risk of operational downtime due to wear in the crane drivetrain and braking systems.


Project Objectives

The key objectives of the project were to:

  1. Restore reliability of critical winch and slewing systems
  2. Replace worn drivetrain and braking components
  3. Improve crane operational smoothness and performance
  4. Reduce the risk of unplanned downtime and mechanical failure
  5. Extend the service life of ageing crane systems
  6. Improve long-term machine uptime and operational reliability

Scope of Work

Alatas engineers completed a structured program of mechanical repairs and replacements across the cranes, including:

  • Replacement of holding and closing winch motor coupling bushes
  • Replacement and setup of closing winch brake shoes
  • Removal and replacement of a slewing motor and gearbox assembly
  • Adjustment of slew gearbox pinion backlash to OEM tolerances
  • Cleaning, inspection, and re-greasing of critical drivetrain interfaces
  • Reassembly, alignment, and operational testing of all systems

Particular attention was given to backlash adjustment of the slew pinion and slew ring gear meshing to ensure smooth and balanced crane operation. Multiple adjustments were carried out to achieve the required setting and match the performance characteristics of the opposing gearbox assembly.

Additional challenges included seized coupling bolts, restricted access, and maintaining alignment tolerances during heavy component replacement.


Execution & Delivery

The works were delivered under full Alatas supervision and project coordination, ensuring safe and efficient execution while minimising disruption to crane operations.

Specialist lifting equipment and tooling were utilized to remove and install large mechanical assemblies, including slew gearboxes and motors. All works were completed under approved RAMS and in accordance with site safety procedures.


Outcome

The program successfully restored smooth and reliable operation of the cranes’ winch and slewing systems. Following installation, alignment, and testing, slewing performance was significantly improved, with smoother crane motion and improved drivetrain operation observed during functional testing.


Benefits Delivered

  • Improved crane reliability and operational performance
  • Reduced risk of drivetrain and braking failures
  • Improved slewing smoothness and motion control
  • Increased machine uptime and operational availability
  • Extended service life of ageing mechanical systems
  • Reduced reactive maintenance requirements
  • Fully managed turnkey mechanical repair delivery by Alatas engineers