Introduction
The recent supervision and procedural guidance provided by Alatas for repairing and servicing two Liebherr CBW 40/24.8 deck cranes marks another milestone in Alatas’ commitment to excellence in crane maintenance. This project, conducted in Viana do Castelo, Portugal, underscores the meticulous approach required for structural repairs, hydraulic system upgrades, and operational testing.
Background
The primary focus was supervising and repairing two deck cranes that exhibited extensive structural damage and hydraulic issues. Both cranes, originally installed in 1998, required significant intervention to restore operational efficiency and ensure compliance with safety regulations.
Key Challenges and Findings:
- Structural Corrosion:
Both crane jibs exhibited extensive corrosion, with damage extending beyond the initial repair scope. Critical areas, such as the thimble clevis and center sheave pin, showed significant wear and deformation. - Hydraulic Issues:
Both cranes had partially disassembled hydraulic systems. Crane #1’s hoisting winch was missing, and water contamination was identified in the hydraulic tank. - Operational Malfunctions:
Initial testing revealed reversed functions in Crane #1 and a non-responsive hoisting system in Crane #2. These issues were traced to missing components and faulty switches.
Alatas’ Solution
The repairs were completed in multiple phases during a series of site visits from October to December 2024:
- Disassembly and Structural Repairs:
The crane jibs were removed, leveled, and braced. Corroded areas were cleaned, and new plates were welded to restore structural integrity. Non-destructive testing (NDT) ensured the quality of all welds, adhering to Alatas’ repair procedures. - Hydraulic System Overhaul:
The hydraulic tanks were flushed, refilled, and tested to eliminate contamination. To complete the system, new hoses and components were installed. - Functionality Testing:
Both cranes underwent pressure adjustments and load testing. Crane #2 successfully lifted 40 tons. Adjustments were made to limit switches and operational speeds to meet performance standards. - Final Adjustments:
The team addressed last-minute issues, including replacing limit switches and troubleshooting slow slewing operations.
Conclusion
The successful restoration of the two deck cranes exemplifies Alatas’ expertise in managing complex crane repairs. Through detailed inspections, precise structural repairs, and rigorous testing, the team ensured that the cranes were restored to optimal performance. This project not only highlights Alatas’ technical capabilities but also underscores their dedication to ensuring the highest standards of safety and reliability in maritime operations.
Job Scope
- Conducted initial structural crane inspections and data collection.
- Provided a comprehensive repair procedure tailored to the cranes’ conditions.
- Supervised the removal and leveling of crane jibs.
- Provided procedural guidance for cleaning corroded areas and replacing them with new plates.
- Outlined and ensured non-destructive testing (NDT) for all welds.
- Advised on hydraulic tank flushing, oil replacement, and hose installations.
- Supervised load testing and ensured proper adjustments for pressure and limit switches.
- Provided troubleshooting guidance for operational malfunctions, including reversed functions and slow slewing.
- Recommended adjustments and replacements for damaged limit switches and faulty components.