Overview
Alatas was tasked with carrying out a hoisting gearbox replacement on a hydraulic deck crane. The project was completed as part of a field service intervention to restore crane performance and ensure safe, reliable hoisting operations.
Crane Details
- Crane Type: Hydraulic Deck Crane
- Brand: Jiangsu Masada–Mitsubishi
- Capacity: 30T x 28m
- Location: Middlesbrough, United Kingdom
- Service Team: AUK Service Department
Background
The crane experienced a severe reduction in hoisting speed and was producing excessive noise during hoisting operations. These symptoms indicated internal failure within the hoisting gearbox, requiring immediate replacement to prevent further damage and operational downtime.
Alatas Solution
Alatas replaced the crane’s main hoisting gearbox. The work was carried out following a structured risk-managed approach, including isolation, controlled removal of the existing components, installation of the new gearbox, and full functional testing to confirm correct operation.
Job Scope
- Hold Technical Risk Assessment (TRA) and Tool Box Talk (TBT)
- Check equipment, including tooling, rigging, and consumables
- Verify availability and condition of spare parts
- Secure jib in rest position
- Perform all isolations and Lock Out Tag Out (LOTO)
- Tag, drain, disconnect, blank off, and secure hydraulic lines
- Remove main hoist motor
- Remove main hoist planetary gearbox
- Install new main hoist planetary gearbox
- Install main hoist motor
- Reconnect hydraulic lines and apply corrosion protection
- Visually inspect condition and integrity of installed components
- Refill hydraulic oil as required
- Restart crane and reinstate all functions and systems
- Perform functional testing
- Tidy worksite
Execution & Testing
The hoisting motor and gearbox were removed using controlled lifting procedures. Following installation of the new gearbox and reconnection of hydraulic systems, the crane was restarted and fully function-tested. Final testing confirmed correct hoisting speed, reduced noise levels, and restored operational performance.
Outcome
The hoisting gearbox replacement successfully restored normal crane operation. The crane was returned to service with improved reliability, correct hoisting performance, and reduced risk of further mechanical failure.