INTRO
At the request of the oil and gas operator, Alatas Worldwide was tasked with supplying a replacement boom for one of their offshore assets.
BACKGROUND
An incident in late 2023 caused a structural failure of one of the asset’s crane booms, resulting in the loss of all components except the boom foot section and the load hoist winch package. Alatas was involved in the initial investigation and subsequently provided a proposal to design and supply a replacement boom.
ALATAS’ SOLUTION
Alatas Worldwide leveraged the capabilities of its offices in the UK, Indonesia, and Singapore to deliver a full turnkey package to restore the crane to operational condition.
Alatas Singapore mobilised local resources to carry out a survey of the asset’s sister crane and collect critical 3D scanning data for use in the design phase.
The Alatas UK design team reviewed the survey and scan data and carried out the complete design engineering scope, reverse-engineering the boom to closely match the original specifications. The structural engineering was conducted in compliance with API 2C, AISC, and AWS design code requirements. Primary and secondary steelwork drawings were submitted, along with engineering reports and overall assembly documentation.
Alatas Indonesia and Singapore continued executing the turnkey package, facilitating the boom fabrication through local fabrication shops.
During fabrication, Alatas UK assessed and developed installation options, including barge installation and skidding systems or bespoke towers. The most viable method within the timeframe was finalized before installation. This involved using a heavy-lift barge and removing the gantry/chassis from the kingpost. The boom foot pins were aligned on the transporter to minimize the effects of vessel motion. Alatas UK provided detailed lifting methodologies and rigging arrangements for lifting the Seatrax crane in a single operation.
Following fabrication, Alatas Singapore and Indonesia supported the loadout and transport of the new boom to the offshore site. The installation was completed through a collaborative effort between Alatas and the heavy-lift barge operator, resulting in the safe installation of the crane onto the kingpost.
JOB SCOPE
- Preparation of a detailed tender/contract for boom delivery and installation
- Site survey and 3D scanning to support design engineering
- Full design engineering for the structural and fatigue analysis of primary steelwork and secondary steel/ancillaries
- Design documentation, including fabrication drawings, assembly drawings, and detailed design reports
- Local fabrication and supply of the replacement boom
- Site survey to evaluate boom installation options
- Engineering design for installation options (e.g., tower feasibility, heavy-lift barge)
- Final documentation for the chosen heavy-lift barge installation method
- Local fit-out and assembly of the boom for transport
- Offshore mobilisation of the boom
- Rigging and removal of the gantry to the transport barge; connection of the gantry to the boom
- Lifting of the assembled crane and placement over the kingpost; lowering onto the foundation
- Assembly of bearings, rope installation, and commissioning activities