Overview
Alatas was engaged to carry out a critical mechanical intervention on a harbour mobile crane experiencing deterioration within its outrigger support system. The project focused on the controlled exchange of four outrigger strut cylinders, followed by functional verification and load testing, to ensure the crane’s continued safe and reliable operation in a port environment.
Crane Details
- Make: Liebherr
- Model: LHM 280
- Type: Harbour Mobile Crane
The LHM 280 is a high-capacity port crane where outrigger performance is fundamental to maintaining stability during lifting operations across varying radii.
Project Objectives
The primary objectives of the project were to:
- Safely remove and replace four outrigger strut cylinders showing signs of wear, corrosion, and water ingress.
- Restore full mechanical and hydraulic integrity of the outrigger system.
- Minimise operational downtime through efficient planning and execution.
- Verify correct outrigger function through controlled testing under load.
- Ensure the crane remained compliant with applicable port crane safety and operational standards.
Scope of Work
Alatas engineers attended site with fully equipped service vans, carrying all required tooling, lifting equipment, consumables, and safety systems to complete the works without reliance on additional external support. A fully developed RAMS package was implemented, and the crane was isolated, locked out, and raised onto its wheel sets to provide safe working clearance.
Each outrigger strut cylinder was depressurised, disconnected, and removed using a controlled jacking and forklift-assisted methodology to prevent damage to surrounding structures.
Key activities included:
- Controlled extraction of cylinders using threaded jacking points
- Cleaning and preparation of outrigger bores
- Installation of new strut cylinders, torqued to OEM specifications
- Reconnection and sealing of hydraulic lines
- Installation of protective gaiters to reduce future water and debris ingress
- Application of corrosion protection to exposed fittings and interfaces
Testing & Verification
Following installation, each outrigger was cycled through multiple full extension and retraction sequences to purge air from the system and confirm smooth hydraulic operation. Static and dynamic load testing was then carried out using a certified test load, with the crane operated at both minimum and maximum working radii. No leaks, drift, or abnormal movement were observed.
Outcome
The outrigger system was successfully restored to full operational condition, significantly improving crane stability and reducing the risk of unplanned downtime. A comprehensive service report was issued, detailing the works completed, test results, and preventative maintenance recommendations.
Benefits Delivered
- Restored crane stability and operational safety
- Reduced risk of outrigger seizure and hydraulic failure
- Improved long-term reliability through enhanced corrosion protection
- Efficient execution using fully equipped Alatas service teams
Harbour Mobile Crane Outrigger Cylinder Exchange & Safety Restoration gallery