Our client tasked ALATAS SINGAPORE to perform a crane main hoist wire change-out and perform a load test thereafter.
BACKGROUND
During vessel operation, they found out one of their heavy cranes (Crane #2) had a damaged main hoist wire; hence, they were unable to certify the crane.
ALATAS’ SOLUTION
ALATAS assigned experienced engineers and technicians to perform a wire change-out (66 mm dia x 260 meters) and, after that, perform a load test using ALATAS water bags and calibrated load shackles.
JOB SCOPE
• Removal of damaged 66 mm dia. X 260 m Main Hoist Wire
• Installation of vessel-supplied new 66 mm dia. X 260 m Main Hoist wire to its original position
• Function Test @ 350 tons
• Dynamic load test: 385 tons using water bags and calibrated load shackles.
Load Test of Heavy Lift Crane