Introduction
Alatas Turkey’s engineering team recently completed a thorough inspection and maintenance of a vessel’s hydraulic deck cranes. Despite ongoing port operations, they identified and addressed several critical issues, provided key recommendations, and carried out essential repairs to ensure the cranes’ optimal performance. This article outlines the scope of work and the solutions implemented by the Alatas Turkey engineering team.
Background
The customer contacted Alatas Turkey via email requesting a comprehensive inspection and maintenance of their cranes to ensure full operational status. This included adjustments to limit switches, oil leak repairs, pressure adjustments, gearbox oil renewal, and internal leak detection. They also requested brake strength testing and inspection of sheaves and bearings to address any potential issues.
Alatas’ Solution
The Alatas Turkey engineering team made several key recommendations and performed targeted repairs. They adjusted limit switches, renewed gearbox oils, conducted internal leak detection for hydraulic motors, and tested brake strengths. They also recommended emptying and cleaning hydraulic oil tanks, flushing the system, and inspecting or replacing sheaves and bearings as necessary.
Job Scope
- Alatas Turkey’s engineering team met with the Superintendent to discuss the job scope and plan the next steps.
- They inspected the limit switches on one crane and found that all required maintenance, including adjustments and replacement of defective switches.
- They recommended repairing oil leaks and adjusting pressures during load tests as per the load table values.
- The team identified the need to renew gearbox oils and analyze the old oils.
- Internal leak detection was conducted for all hydraulic motors.
- Due to ongoing port operations, brake tests could not be performed. Measuring brake strengths and replacing necessary components are still required.
- Previous hydraulic oil analysis showed high metal parameters, leading to recommendations to empty and clean the hydraulic oil tanks and flush the system.
- Inspection of the hook block, jib head hoist, and luffing sheaves was not possible due to ongoing port operations. It is recommended to dismantle and inspect these components and replace bearings or sheaves if necessary.