Hydraulic Hose Changeout Across NOV BOP Handling Equipment

ALATAS’ SERVICEField Service
LOCATIONAmericas / Guyana / Offshore Guyana
EQUIPMENTOffshore Drilling & Subsea Handling Equipment
BRAND / MODELNOV (National Oilwell Varco) / Not Specified

Introduction

Alatas completed a comprehensive hydraulic hose replacement program across multiple NOV (National Oilwell Varco) BOP handling, riser, and subsea handling systems aboard an HHI drillship operating offshore Guyana. The project covered eleven critical equipment interfaces and several hundred hydraulic hoses, all of which were removed, pressure tested, tagged, and reinstalled in accordance with OEM specifications. The program restored hydraulic system integrity, ensured complete hose traceability, and enhanced the long-term reliability of critical drilling equipment.


Background

As part of a planned maintenance program, the operator identified the need to replace hydraulic hoses across several critical drilling and subsea handling systems. Equipment, including the BOP overhead crane, wireline riser tension system, moonpool trolley, riser handling catwalk, and associated handling equipment, had accumulated normal service wear, requiring hose replacement to maintain safe and reliable operation.

Given the critical nature of these systems, the project demanded a carefully controlled replacement program that maintained full traceability of every hydraulic hose while minimizing disruption to offshore operations.


Alatas’ Solution

Alatas mobilized a specialist offshore field service team to manage the hydraulic hose replacement program from removal through final commissioning. Every hose was individually identified, measured, and recorded against OEM schematics, including its length, size, pressure rating, hose series, and orientation, ensuring complete traceability throughout the project.

Replacement hoses were manufactured to the exact OEM specifications before being pressure tested at 1.5 times their working pressure, held under pressure for five minutes, and pigged clean and dry before installation. Following installation, each handling system underwent functional testing to verify correct operation and confirm leak-free performance. To improve long-term corrosion protection, all exposed steel fittings were treated with Denso paste and tape before the equipment was returned to service.


Job Scope

  • Replace hydraulic hoses across 11 critical NOV drilling and subsea handling systems, including:
    • BOP overhead crane with auxiliary winches (125 hoses)
    • Wireline riser tension system (123 hoses)
    • Maintenance baskets (4 units) (86 hoses)
    • Riser handling catwalk with tail arm (72 hoses)
    • Moonpool trolley (33 hoses)
    • Riser elevation crane system (32 hoses)
    • Riser gantry crane (31 hoses)
    • Retractable BOP test stump – port and starboard (22 hoses)
    • Xmas tree gantry crane (22 hoses)
    • Trolley Xmas tree casing hang-off (17 hoses)
    • BOP bulkhead sea fixings (No. 1 & No. 2)
  • Record and verify hose identification, dimensions, pressure ratings, and orientation against OEM schematics to ensure complete traceability.
  • Manufacture replacement hoses to the exact OEM specifications.
  • Pressure-test every hose at 1.5 times the working pressure and hold for 5 minutes.
  • Pig all hoses clean and dry before installation.
  • Install, tag, and certify every hydraulic hose.
  • Apply Denso paste and tape to exposed steel fittings for long-term corrosion protection.
  • Function test every system following installation to verify correct operation and confirm leak-free performance.

Execution & Delivery

The project was executed offshore using a structured replacement process that ensured every hydraulic hose remained fully traceable from removal through fabrication, testing, installation, and commissioning.

Close coordination between Alatas engineers and the vessel’s maintenance team enabled the extensive hose replacement program to be completed safely and efficiently across multiple critical handling systems while maintaining the drillship’s operational readiness. Rigorous testing and inspection procedures ensured each system was returned to service in full compliance with OEM requirements.


Outcome

The hydraulic hose replacement program was completed across all planned equipment, restoring the integrity and reliability of multiple critical drilling and subsea handling systems. Comprehensive testing, certification, and documentation gave the operator complete confidence in the renewed hydraulic infrastructure and supported continued safe and efficient offshore operations.


Benefits Delivered

  • Comprehensive hydraulic hose replacement across multiple critical drilling and subsea handling systems
  • Complete traceability of every hydraulic hose through detailed documentation and tagging
  • Pressure-tested and certified hose assemblies installed to OEM specifications
  • Improved hydraulic system reliability and operational safety
  • Enhanced corrosion protection through the application of Denso-treated steel fittings
  • Reduced risk of hydraulic failures and unplanned downtime
  • Efficient offshore execution with minimal disruption to operations
  • Extended service life of critical drilling and subsea handling equipment