ALATAS’ SERVICEFIELD SERVICE
LOCATION  ASIA / INDIA / MUMBAI
EQUIPMENT  SHIP TO SHORE GANTRY CRANES
BRAND / MODELZPMC

INTRODUCTION

The function check for boom normal and emergency operation ensures proper system performance and safety compliance.

BACKGROUND

In early 2024, the crane experienced an accident where the boom system continued pulling the wire rope even after the boom was mechanically stuck in the A-frame. The excessive force exerted by the wire rope caused structural deformation of the boom. Mechanical repairs were completed by the end of 2024, necessitating a control system and interlock inspection.

ALATAS’ SOLUTION

To assess and verify the boom operation, the team utilized tracing software for signal recording and performed the following tasks:

  1. Compared the wiring diagram, PLC software, and drive parameters with an identical crane.
  2. Reviewed the wiring diagram against the actual boom function.
  3. Recorded signal feedback to the system.
  4. Inspected all safety circuit interlocks, wiring, and reset procedures.
  5. Verified the location and functionality of limit switches on the A-frame.
  6. Tested boom operation using the emergency system.
  7. Tested boom operation using the drive system.

JOB SCOPE

1. Automated Control System Inspection

1.1. Review and Verification

  • Conducted a comprehensive review of the existing boom permissive control system logic.

1.2. Permissive Logic and Interlock Verification

1.2.1. Boom Up Permissive Interlocks
  • Verified encoder functionality for:
    • Up slow-down condition.
    • Up-stop condition.
  • Inspected up stop limit switch functionality.
  • Verified up overtravel limit switch functionality.
  • Assessed boom jam protection functionality (if available in the PLC/drive control system).
  • Confirmed latch order functionality (latch up/down).
1.2.2. Boom Down Permissive Interlocks
  • Validated encoder functionality for:
    • Down slow-down condition.
    • Down stop condition.
  • Ensured proper operation of the slack rope limit switch when the boom reaches the horizontal position.
  • Verified functionality of the boom drum wire rope overlap/overturn protection roller (limit switch) within the automated control framework.

2. Emergency Drive Control Inspection

2.1. Review and Verification

  • Conducted a detailed review of the existing Direct-On-Line (DOL) boom emergency control system.

2.2. Emergency Up/Down Permissive Circuit Verification

2.2.1. Boom Emergency Up Permissive Interlocks
  • Confirmed coupling of the emergency drive chain and ensured the automated control system was disabled.
  • Selected the emergency system control and performed operational tests on the emergency motor.
  • Manually released the boom hoist emergency brake.
  • Ensured the boom service brake was connected to the DOL system to allow brake release during boom-up operation (manual selector control) via the emergency system.
  • Verified functionality of the latch manual operation (latch-up/down).
  • Confirmed interlock functionality between the boom up stop limit switch, overtravel limit switch, and the boom emergency drive DOL system.
2.2.2. Boom Emergency Down Permissive Interlocks
  • Validated the functionality of the boom service brake within the DOL system to enable brake release during boom-down operation (manual selector control) via the emergency system.
  • Confirmed interlock functionality for the boom-down stop (slack rope limit switch).
  • Verified operation of the boom drum wire rope overlap/overturn protection roller (limit switch) within the emergency control system.