Intro
Innovative and cost-effective method for removing and replacing boom foot pins and bearings using rams and rigging, pivoting on the boom’s center of gravity.
Background
At the client’s request, Alatas UK Ltd has been tasked with replacing the boom foot bearings on the Kenz crane aboard their vessel. The work will be carried out while the vessel is berthed at A&P Tees in Teesside.
Alatas’ Solution
The work scope includes replacing the boom heel bearings and pins. This involves jacking up the boom once the pins are removed, using rams to allow access to the bearing housings, and then removing and replacing the bearings and housing plates.
Job Scope
- Once the crane was at rest, Alatas worked with the scaffolding contractor to construct the scaffolding according to the required specifications, ensuring the safe rigging and fleeting of components.
- The rigging at the boom rest consisted of two 35-te load sensing shackles, two 35-te synthetic slings, and two 35-te turnbuckles. The crane was de-isolated, and the packing adjusted to enable a stable and secure base, ensuring clearance at the helideck once the boom was raised.
- Final checks of measurements and clearances were made, and the boom foot-jacking cylinders and rigging were set up. The crane was then isolated.
- For pin removal and lancing, the crane was fireproofed. A toolbox talk was held with the crew and Alatas to explain the dangers and hazards of lancing, as well as the requirements for fire watchers and fire hoses both on the crane and on deck.
- The first pin to be lanced was the port pin. Lancing was carried out using 3m x 1” lancing rods, typically reaching temperatures around 4000°C. The lancing involved cutting a slot in the pin, then force quenching it to cause contraction, followed by pulling with a successful pull at 80 te.
- The same procedure was repeated on the other side.
- Lifting of the boom and bearing removal: Using the jacking cylinders, the bearing housing was cleared on both sides. During removal, severe scarring and splitting were noted in the bearing cage.
- Upon cleaning out the bore, the damage became more evident. The port bearing had collapsed, and the starboard bearing had over time gripped the pin, causing the noises heard when using the crane.
- The bearing housing was cleaned up and measured using an internal micrometer set.
- Reassembly: Once the bores were cleaned and ready for the new bearings, they were lightly lubricated and installed. The boom was lowered into place by alternately lowering each side until it was in position. Once in place, the bores were aligned and the pins, which had been submerged in a dry ice bath to freeze them, were installed. Following installation, the jacking system was fully reassembled.