| ALATAS’ SERVICE | FIELD SERVICE |
| LOCATION | EMEA / NETHERLAND / DEN HAAG |
| EQUIPMENT | SHIP CRANES / DECK CRANE |
| BRAND | NMF DK II 60016/40025/34028 |
Intro
The customer requested urgent troubleshooting for their vessel, which was en route to Africa. We promptly attended to the vessel at Scheveningen Anchorage, where it had stopped for repairs.
Background
The customer reported an issue with the boom’s lowering mechanism at the last port. The boom could not be fully lowered for the voyage.
ALATAS’ Solution
We checked all relevant signals to the PLC, inspected the Can-Bus system, and examined the LoadMaster inputs. We identified a faulty digital input module in the cabin console during the inspection. The module was promptly replaced, and the crane was thoroughly tested. The work was completed to the customer’s satisfaction, with only minimal delay to the vessel’s schedule.
Job Scope
- Inspected joysticks.
- Verified limit switches.
- Checked the Can-Bus system.