Liebherr MPG Offshore Crane Slew-Bearing Replacement

Overview

Alatas was engaged to deliver a complete slew bearing replacement programme on a Liebherr MPG 30×38 Litronic crane installed aboard a transhipper vessel. Excessive wear of the crane’s slew bearings had begun to compromise operational reliability and long-term asset integrity. Given the size and complexity of the crane structure, the project required extensive engineering planning, specialist lifting arrangements, and a carefully controlled execution strategy to safely replace both slew bearings while minimising vessel downtime.


Background

Routine inspections identified excessive wear in the crane’s slew bearings, increasing the risk of unplanned downtime and reduced operational performance. As a critical asset supporting continuous transhipment operations, restoring the crane’s slewing capability was essential to maintaining safe and efficient cargo handling.

The scale of the crane and the complexity of the replacement required the controlled removal of major structural components, extensive lift engineering, and detailed planning to ensure the work could be completed safely within the operational constraints of the vessel.


Alatas’ Solution

Alatas delivered a fully managed turnkey solution encompassing engineering, project management, lift planning, and field service execution. Detailed work packs, rigging studies, lift plans, and engineering assessments were completed before mobilisation to ensure every phase of the project could be executed safely and efficiently.

Major crane assemblies, including the 72.5-tonne grab arm assembly and 110-tonne main boom assembly, were removed using engineered lifting procedures. Following dismantling, both slew bearings were removed, bearing mounting surfaces were inspected for flatness, and corrective machining was carried out where required before installing the new slew bearings and bolts.

Upon completion of the mechanical works, the crane was reassembled, mechanical and electrical systems were reconnected, and comprehensive functional and load testing was performed before returning the crane to service.


Job Scope

  • Develop detailed work packs and engineering documentation.
  • Perform rigging studies and prepare engineered lift arrangement drawings.
  • Develop lift plans for tandem lifting operations.
  • Remove the 72.5-tonne grab arm assembly.
  • Remove the 110-tonne main boom assembly.
  • Remove and replace two slew bearings.
  • Inspect bearing mounting surfaces for flatness.
  • Perform corrective machining where required.
  • Install new slew bearings and slew bolts.
  • Reassemble the crane structure and slew drives.
  • Reconnect mechanical and electrical systems.
  • Conduct functional testing, safety verification, and load testing.

Execution & Delivery

The project was executed under full Alatas supervision using a structured, engineering-led approach. Extensive planning was completed before mobilization, including rigging specifications, lift plans, tooling requirements, and site assessments.

Close coordination between the engineering, project management, and field service teams ensured the work was completed safely and efficiently while operating within the constraints of a transhipper vessel. All activities were carried out under approved RAMS and in accordance with applicable offshore lifting and safety procedures.


Outcome

The slew bearing replacement programme was completed successfully, restoring the crane’s slewing capability, structural integrity, and operational reliability. Following reassembly, functional checks, safety inspections, and load testing confirmed the crane was ready for service, providing the operator with renewed confidence in the asset’s long-term performance.


Benefits Delivered

  • Restored safe and reliable slewing performance.
  • Extended the operational life of a critical transhipper vessel crane.
  • Reduced the risk of unplanned failures and operational downtime.
  • Delivered a fully managed turnkey solution from engineering through commissioning.
  • Safely executed the removal and reinstallation of major crane structural components.
  • Improved long-term asset reliability and maintainability.
  • Minimized operational disruption through detailed planning and controlled execution.

Scroll to Top