INTRO
The LHM 320 mobile harbor crane was making extreme noises during luffing operations.
BACKGROUND
The luffing cylinder generated extreme noises during operations due to a collapsed bearing at the tower-end clevis.
ALATAS’ SOLUTION
- The luffing cylinder was removed.
- Line boring was performed to address the damage caused by the collapsed bearing.
- Bearings were replaced with new sleeve bushes, and the luffing cylinder was reinstalled.
JOB SCOPE
- Site set-up and equipment testing.
- Crane boom placed in the rest position.
- Crane shut down and isolated.
- Luffing cylinder depressurized.
- Thermic lancing of the tower and boom pins.
- Rigging set up for lifting the luffing cylinder.
- Both pins removed using hydraulic pulling jacks.
- Luffing cylinder secured on deck.
- Old damaged bearings removed.
- Line boring performed on damaged bores to restore them to their original size.
- New sleeve bushes installed.
- Luffing cylinder hoisted back into position.
- New pins and keeper plates fitted and secured.
- Crane started and tested for leaks and pressure.
- Crane raised to the working position and function tested.
- Partial load test of 16.25T completed with test weights.
- Site tidied up, and all equipment removed.
Luffing Cylinder Bearing Replacement Gallery