Alatas Turkey’s engineering team recently tackled critical issues on a vessel’s cranes, addressing problems with the hoisting and luffing drums. They replaced damaged components, conducted thorough testing, and successfully restored the cranes to full functionality. This article details the steps taken to achieve this.

Background

The customer reached out to Alatas Turkey via email, requesting a replacement of the luffing gearbox and troubleshooting of electrical and hydraulic components on their cranes.

Alatas’ Solution

The team performed a series of tests, renewed all filters, adjusted limits, tested the motor, dismantled and reassembled parts, and overhauled the cranes.

Job Scope

  1. Initial Inspection: Upon arrival at the vessel, the team conducted preliminary checks. They tested the emergency lowering system by hand pump, reaching 40 bars without movement on the hoisting drum. They found that the luffing drum was not turning due to a damaged gearbox.
  2. Disassembly:
    • The crew removed the hoisting motor, and brake, and marked flexible hoses to clear access.
    • They discovered a cut electrical cable on the luffing brake solenoid valve.
    • The drum was turned slightly to remove the luffing wire rope, and foundations and ladders were removed for access.
    • With assistance from another crane, the luffing drum was removed and transferred to the hatch cover for gearbox and encoder bolt replacement.
  3. Repairs:
    • During removal, a damaged gearbox pipe fitting was replaced by a fitter.
    • Thread damage was repaired, and new pipes and hoses were installed.
    • Brake tests were completed, ensuring proper function.
    • The drum was reinstalled, bolts were tightened, and the hydraulic motor was mounted. All hydraulic hoses and pipes were connected.
    • Foundations and ladders were reassembled. Damaged flexible hoses were repaired, and the gearbox was filled with oil.
  4. Testing:
    • The cabin was closed to test the crane without a wire rope connection. No problems were detected.
    • The luffing wire rope was connected and tightened, and the crane underwent operation and function tests with a grab, showing no issues.
    • Filters were renewed, limits adjusted, and the hoisting motor was checked. The motor shaft did not turn due to damage.
  5. Further Repairs:
    • The brake was removed to inspect the gearbox. The drum turned easily by hand, but gear oil contained metallic particles, indicating the need for a new hoisting gearbox.
    • Damaged flexible hoses were replaced. The inner and outer brake discs were reinstalled correctly with new O-rings and springs.
    • The motor’s bearings and shaft seals were renewed using parts from the old motor. The damaged shaft was reused due to the unavailability of a new one.
    • The motor was tested with a spanner after reassembly, showing no issues. The hoisting motor and brake were reinstalled.
  6. Final Checks:
    • All flexible hoses and electrical connections were completed, and gear and hydraulic oils were filled.
    • A low-pressure alarm was detected; the BP2 hoisting pressure switch was replaced.
    • Incorrect connections were corrected, and after retesting, the crane showed no issues or alarms.
    • The hoisting wire rope was correctly fixed, and the final function and operation tests were successful. The crew was advised to adjust the limits and provided with recommendations for future maintenance.