Alatas UK was tasked with carrying out the changeout of a luffing winch.
Background
Oil samples taken from the crane revealed significant metal particle contamination, indicating wear on either the bearings or gear teeth. Since the crane was to be used for a critical flushing campaign, it was imperative to overhaul the luffing winch to ensure reliable operation.
To remove the luffing winch, the auxiliary (aux) winch also had to be removed. Both the luffing and aux ropes were secured with rigging and pull hoists. Using the crane controls, the ropes were carefully backed off, removed, and secured. Once the ropes were removed, the crane was shut down and isolated.
All oils were drained from both winches and disposed of properly. The motors and brake packs were stripped and removed, then set aside for reinstallation upon the arrival of the refurbished winch.
Alatas’ Solution
The scope of work included the removal of the luffing winch for onshore overhaul, followed by its reinstallation and testing. Key activities performed were:
- Installation of the refurbished luffing winch.
- Reinstallation of the auxiliary winch.
- Reinstallation of all brake packs with new discs and springs.
- Refilling of all oils.
- Reinstallation of both ropes.
- Function checks and fine-tuning of limits.
- Stall testing of brakes.
- Rocking motion and backlash measurements.
- Final load testing of auxiliary and main lines, returning the crane to service.
Job Scope
- The aux winch drum was removed first to provide access to the luffing winch.
- The luffing winch was lifted out using rigging and lowered onto the deck, then secured on a pallet for transport to shore for refurbishment.
- Preparatory work was carried out to ensure minimal downtime once the refurbished winch was returned.
- The luffing winch was reinstalled and bolted into place, followed by the reinstallation of the brake pack, and motor, and replenishment of all oils.
- The aux winch was also reinstalled, including its brake packs, motor, and oil.
- The crane was started up and checked for leaks, with no leaks detected and all systems functioning properly.
- Both luffing and aux ropes were reinstalled. Initial issues with limit switches cutting in were resolved through adjustments during function checks.
- Scaffolding was removed, and final function checks confirmed no leaks or further issues.