| Alatas Service | Field Service, Engineering |
| Location | Vlissingen, Netherlands |
| Crane Manufacturer | NMF |
| Crane Spec | 1000ton |
Alatas Europe was asked to perform this NMF crane jib removal in Vlissingen in the Netherlands which included the preparation, disconnection and removal of the extension jib from a 1000ton crane.
Job Scope
- Preparation for jib removal
- Removal of the main rams horn hook
- Removal main hoist wire rope and tugger winch lines
- Securing of jib mast
- Removal of fibre pendants
- Removal of extension jib
Job Gallery for NMF Crane Jib Removal in the Netherlands

Removing the hook from the block swivel 
Separating the hook from the block 
Securing the block on the deck 
Un-reeving the hoist wire from drum 1 to drum 2 
Setting down the boom in horizontal position 
Securing the mast with lashing wires to the deck 
Lifting the jib to install the mast stay bars 
Mast stay bars installed 
Disconnecting the back fibre pendant ropes 
Lifting the fibre pendant rope down 
Setting the jib end down onto the deck 
Setting up the hydraulic jack and pulling gear 
Attaching the jib lifting slings 
Lowering down the main jib pin to the deck 
Removing the jib from the main boom 
Setting down the jib onto the deck 
Pendant pin safety lock 
Pendant pin anti-rotation locks (missing on the jib head) 
Main jib pin lubrication 
Main jib pin bush lubrication