Alatas was engaged to carry out a fabric maintenance campaign on an offshore pedestal crane following findings identified during Reports of Thorough Examination (RoTE).
The maintenance program prioritized the boom backstops and lattice boom lacing, with planned rope-access works including cleaning, surface preparation, painting, Denso tape application, coating repairs, and the replacement of corroded fasteners. The Alatas rope-access team completed maintenance on the key reported areas and additional locations identified during an on-site assessment.
Project Objectives
The key objectives of the project were to:
- Address coating breakdown and corrosion identified during the latest Report of Thorough Examination
- Restore protective coatings on the boom backstops and lattice boom structure
- Protect perforated areas against further water ingress and corrosion
- Replace corroded fasteners presenting potential dropped-object hazards
- Maintain structural integrity and operational safety
- Extend the operational life of the offshore crane
Background
Due to harsh offshore operating conditions and the advanced age of the equipment, coating breakdown and corrosion had developed across several areas of the crane structure.
Sections of the lattice boom had developed localized perforations where the protective coating system had failed, particularly around the lattice boom lacing and boom backstops. Additional areas of coating breakdown had also resulted in less severe localized corrosion along the boom.
These findings required a targeted fabric maintenance program to prevent further deterioration, maintain asset integrity, and support the continued safe operation of the crane.
Alatas Solution
Alatas mobilized a three-person rope-access team to carry out fabric maintenance on the identified defects. Following an on-site walkaround, the team addressed the priority areas identified in the inspection reports, together with additional locations recommended by the crane operator.
The affected surfaces were mechanically prepared by removing failed coatings and corrosion before applying a four-coat marine paint system suitable for offshore environments.
Following engineering assessment and client approval, perforated areas were wrapped with Denso tape to provide protection against water ingress while maintaining accessibility for future inspection. This repair method was selected based on the crane’s specific operating characteristics and expected remaining service life.
Corroded fasteners on tertiary structures and equipment attached to the boom were also replaced to mitigate potential dropped-object hazards and improve operational safety.
Scope of Work
- Mobilisation of a three-person rope-access team
- Review of defects identified in the latest Report of Thorough Examination
- On-site inspection and identification of additional maintenance areas
- Fabric maintenance of the boom backstops and lattice boom lacing
- Mechanical removal of failed coatings and surface corrosion
- Surface preparation of affected areas
- Application of a four-coat offshore marine paint system
- Application of Denso tape to approved perforated areas
- Coating repairs across additional areas of the crane structure
- Replacement of corroded fasteners on tertiary structures and attached equipment
- Final inspection and completion of maintenance documentation
Execution & Delivery
The project was delivered through close coordination between Alatas Managed Crane Contracts, Project Engineering, WELS, and Site Services teams.
Specialist rope-access techniques enabled maintenance to be completed safely and efficiently across difficult-to-access sections of the crane without requiring extensive scaffolding or major disruption to offshore operations.
All coating repairs and corrosion treatment were completed using materials and procedures suitable for the harsh offshore environment. The application of Denso tape to perforated areas was completed following engineering assessment and client approval.
Outcome
The fabric maintenance campaign successfully addressed priority corrosion and coating defects identified during the reports of thorough examination.
Protective coatings were restored across key areas of the boom structure, while approved perforated sections received additional protection against water ingress. The replacement of corroded fasteners also reduced potential dropped-object risks associated with tertiary structures and equipment attached to the boom.
The completed works improved asset integrity, supported continued safe crane operation, and extended the operational life of the equipment.
Benefits Delivered
- Restoration of protective coatings on critical crane structures
- Improved corrosion protection in harsh offshore conditions
- Extended operational life of the crane
- Reduced risk of further structural deterioration
- Reduced potential for water ingress at approved repair locations
- Mitigation of dropped-object hazards through fastener replacement
- Efficient access to difficult work areas using specialist rope-access techniques
- Improved asset integrity and long-term maintainability
- Coordinated delivery by Alatas engineering, maintenance, and offshore service teams