Alatas UK was engaged to support the rectification of hydraulic system contamination on an offshore pedestal crane in the North Sea. The scope involved system strip-down, removal of contaminated components, and flushing of hydraulic pipework to restore system cleanliness and prepare the crane for return to service.


Background

The issue originated from a critical hydraulic pump failure, which resulted in contamination throughout the crane’s hydraulic system. Oil sampling across multiple system points confirmed the presence and extent of contamination.

Due to the safety risks associated with operating a contaminated hydraulic system, the crane was taken out of service, requiring immediate intervention to prevent further damage and restore operational integrity.


Alatas Solution

Following confirmation of the contamination, the Alatas engineering team conducted a detailed system review and developed a structured rectification plan.

An engineering workpack, including procedures and risk assessments, was prepared to ensure safe offshore execution. Alatas mobilized personnel, tools, and equipment to site, enabling rapid response and controlled intervention.

The hydraulic system was isolated and drained, and all affected components—including pumps, motors, valves, coolers, and hoses—were removed. These components were sent onshore for refurbishment and overhaul.

System tubing and pipework were pellet flushed to remove contamination and restore internal cleanliness. All open connections were suitably blanked, and components were tagged to ensure accurate reassembly.


Scope of Work

  • Verification of contamination and system condition through oil sampling
  • Development of engineering procedures and risk assessments
  • Mobilisation of offshore service personnel, tools, and equipment
  • Isolation and draining of the hydraulic system
  • Removal of key hydraulic components, including:
    • 2x winch motors
    • 4x slew motors
    • Main control valves
    • Hydraulic pump
    • 2x oil coolers
  • Removal and replacement preparation of associated hoses
  • Tagging and identification of connections for reassembly
  • Blanking of open system connections
  • Pellet flushing of hydraulic tubing and pipework
  • Handover documentation and client reporting

Execution & Delivery

The project was executed offshore under controlled conditions, following an approved engineering workpack and RAMS.

Alatas deployed a coordinated team from project engineering and service departments, ensuring safe system isolation, controlled component removal, and effective contamination management.

The combination of rapid mobilization and structured execution enabled efficient progression of the first phase of the rectification campaign.


Outcome

The contaminated hydraulic system was successfully stripped down, and critical components were removed for refurbishment. System pipework was flushed to restore cleanliness, establishing a solid foundation for reassembly and return to service.


Benefits Delivered

  • Rapid response to critical offshore equipment failure
  • Effective containment and removal of hydraulic contamination
  • Restoration of system cleanliness through controlled flushing
  • Reduced risk of further component damage
  • Structured and safe offshore execution
  • Preparation for efficient reassembly and return to operation