Introduction
ABP Southampton requested ALATAS to address a breakdown under our service contract.
Background
The SLI (Safe Load Indicator) readout gradually increased from 0 to 40 tons, even with no load on the hook.
ALATAS’ Solution
Water ingress into the main control box damaged a PCB (Printed Circuit Board). We replaced the damaged PCB with a spare and calibrated the SLI using a water bag and an external load cell.
Job Scope
- Diagnose the fault in the PCB.
- Replace the faulty PCB with a spare unit.
- Conduct additional fault-finding due to a faulty relay in the spare PCB.
- Replace the faulty relay in the spare PCB.
- Calibrate the SLI.
- Assist the customer with spare parts and upgrade recommendations, as the current system is obsolete and the OEM no longer provides spare parts.