Replace boom lattice included post repair NDT SWL and a Proof Load test

ALATAS’ SERVICEFIELD SERVICE
LOCATION  EMEA / UK / UK
EQUIPMENT  MOBILE HARBOUR CRANES / RAIL MOUNTED LUFFING CRANES
BRAND / MODELS&P 32T

INTRODUCTION

Alatas UK was engaged to repair, replace, and test the boom lattice of a port crane to restore its reliability. The scope of work included conducting post-repair Non-Destructive Testing (NDT), Safe Working Load (SWL) testing, Proof Load testing, and post-load NDT to ensure the crane met operational and safety standards. This project highlights the critical importance of regular maintenance and condition monitoring in preventing costly downtime and maintaining the efficiency of port operations.

BACKGROUND

Regular maintenance of port cranes is vital to minimizing downtime, preventing accidents, and ensuring peak operational efficiency. The proactive repair project aimed to prevent potential failures and breakdowns that could disrupt port operations. The scope included the inspection, repair, and replacement of damaged boom lattice components to ensure optimal performance and reliability. The repairs were completed within a short lead time, demonstrating Alatas UK’s efficiency and expertise.

ALATAS’ SOLUTION

Alatas UK implemented a series of strategic actions to address the damaged crane:

  1. The Safe Load Indicator (SLI) system settings were adjusted to reduce the Safe Working Load (SWL) of the crane by 25%, accommodating the bent boom lattice while minimizing operational disruptions.
  2. The damaged lattice sections were removed using angle grinders, ensuring the lattice was securely supported to prevent accidental falls during the process.
  3. The flange surface was prepared for welding, and the new lattice piece was test-fitted, cut to size, and tack-welded before final welding was completed.
  4. Post-repair NDT was conducted to verify the integrity of the new welds.
  5. The alarms and motion cut-off points were reset and tested in compliance with the Rayco Wylie Manual, confirming their proper function during the load test.
  6. A Safe Working Load (SWL) test at 32 tons was conducted, followed by a Proof Load test at 35 tons using a water bag.
  7. Post-load test NDT of the welds was carried out to ensure structural integrity.

Throughout the project, strict safety regulations were adhered to, ensuring the cranes were safe for use and met all regulatory requirements.

JOB SCOPE

  • Measurement of damaged lattice sections
  • Adjustment of SLI system settings
  • Replacement of lattice components
  • Post-repair NDT
  • Resetting and testing alarms and motion cut-off points
  • Load testing
  • Post-load test NDT

Replace boom lattice included post repair NDT SWL and a Proof Load test