INTRODUCTION
Our team successfully completed the replacement of the tower sheaves (hoist and luff rope) at Hazira Port. The crane relies on sheaves as essential components to ensure smooth and efficient lifting operations.
BACKGROUND
Bearing wear is inevitable as equipment ages. In this case, unusual noise from the bearing locations indicated potential issues. To prevent major failures and unexpected downtime, the proactive replacement of the sheaves was recommended.
ALATAS’ SOLUTION
Following an operational inspection, we identified that the noise was coming from sheaves No. 11 and 12 (as shown in the figure below) due to bearing damage.

Alatas promptly dispatched a skilled team equipped with the necessary tools to the vessel. The team successfully replaced the hoist and luff wire rope sheaves on Crane #1 within 8 hours. After installation, the crane was tested, and the repair was confirmed complete.
JOB SCOPE
- Replacement of hoist and luff wire rope sheaves