STS Crane Cabin Replacement

Overview

Alatas was engaged to deliver a full operator cabin replacement on an STS quayside container crane (QC crane) following deterioration of the existing cabin structure, reduced operator comfort, and aging equipment. The project involved the removal of the existing cabin, installation of a modern replacement cabin, and full integration of electrical, control, and operator systems to restore safe and reliable crane operation.


Project Objectives

The key objectives of the project were to:

  1. Safely remove and replace the existing crane operator cabin
  2. Improve operator safety, visibility, and working environment
  3. Upgrade ageing cabin infrastructure and associated systems
  4. Minimise crane downtime during the exchange programme
  5. Deliver a fully managed turnkey installation solution
  6. Improve long-term crane reliability and operational availability

Scope of Work

Alatas delivered a structured cabin replacement program, including

  • Engineering survey and work pack development
  • Removal of the existing operator cabin and associated services
  • Supply of a new operator cabin manufactured by Metagro
  • Installation and alignment of the replacement cabin assembly
  • Integration of electrical, control, communication, and HVAC systems
  • Reconnection of operator controls and monitoring systems
  • Inspection and reinstatement of cabin access arrangements
  • Functional testing, commissioning, and operational verification

The replacement cabin provided significant improvements in operator ergonomics, visibility, environmental protection, and overall working conditions.

Additional works included upgrades to internal cabin systems and reinstatement of safety-critical functionality to ensure reliable crane operation following installation.


Execution & Delivery

The project was delivered under full Alatas project management, ensuring coordination of engineering, lifting operations, installation, and commissioning activities.

Alatas worked closely with Metagro throughout the project to coordinate the manufacture, delivery, and installation of the replacement cabin. This collaborative approach ensured that the project was completed on schedule, within budget, and in accordance with all operational and safety requirements.

Detailed planning and staged execution allowed the works to be completed safely and efficiently while minimizing operational disruption. All activities were carried out under approved RAMS and lifting plans, with specialist lifting equipment and installation tooling mobilized specifically for the cabin exchange.


Outcome

The new operator cabin, supplied by Metagro and installed by Alatas, was successfully commissioned, restoring safe and reliable crane operation. The upgraded cabin significantly improved operator comfort, visibility, and working conditions while enhancing the long-term reliability of associated control and monitoring systems.

The close collaboration between Alatas and Metagro ensured the successful delivery of the project on time and within budget.


Benefits Delivered

Fully managed turnkey cabin replacement delivered by Alatas engineers

Improved operator safety and working environment

Enhanced visibility and operational control

Reduced risk associated with ageing cabin infrastructure

Increased crane reliability and operational availability

Minimal disruption through planned installation and commissioning

Modernised cabin systems and improved operator ergonomics

On-time and on-budget delivery through close collaboration between Alatas and Metagro

 



 