Terex CC4800 Hydraulic Hose Exchange & Reliability Improvement

Overview

Alatas was engaged to carry out a large-scale hydraulic hose replacement program on a Terex CC4800 crawler crane following ongoing reliability concerns, aging hydraulic infrastructure, and deteriorated hose assemblies. The project involved the replacement of critical hydraulic hoses, fittings, clamps, and associated components to restore operational reliability, reduce the risk of hydraulic failure, and establish a fully documented hose management system.


Project Objectives

The key objectives of the project were to:

  1. Replace ageing and deteriorated hydraulic hoses and fittings
  2. Improve hydraulic system reliability and operational safety
  3. Minimise the risk of unplanned breakdowns and oil leaks
  4. Restore system integrity on a heavily utilised crane
  5. Create a comprehensive hydraulic hose register to support future maintenance and asset tracking
  6. Reduce reactive maintenance costs and downtime
  7. Improve long-term machine uptime and operational reliability

Scope of Work

Alatas engineers carried out a structured hydraulic replacement program, including:

  • Removal and replacement of hydraulic hoses throughout critical crane systems
  • Replacement of hydraulic fittings, clamps, and associated components
  • Inspection of hydraulic routing and support arrangements
  • Identification and recording of hose specifications and installation locations
  • Development of a detailed hose register to support future maintenance planning
  • Hydraulic priming and system reinstatement
  • Functional testing and verification of hydraulic operation
  • Inspection of associated electrical systems during the works

During the project, the condition of the hydraulic system highlighted the extent of degradation within the crane. Engineers identified heavily contaminated hydraulic oil, including evidence of water ingress and deterioration caused by age and long-term exposure to harsh operating conditions.

Additional challenges included:

  • Corroded and seized fittings
  • Restricted access areas
  • Adverse weather conditions
  • Age-related degradation across the hydraulic infrastructure

Execution & Delivery

The works were delivered under full Alatas supervision and project coordination, ensuring the replacement program was completed safely and efficiently despite operational and environmental challenges.

Specialist tooling, hydraulic equipment, and replacement components were mobilized to support the scope, enabling the team to carry out the hose exchanges and system reinstatement works in a controlled and systematic manner.

All activities were completed under approved RAMS and in accordance with site safety procedures.


Outcome

The hydraulic hose exchange program successfully restored hydraulic system integrity and significantly improved the reliability of the crane. The newly developed hose register provided the customer with improved traceability, simplified future replacement planning, and enhanced maintenance control.

Following reinstatement and testing, the crane was returned to operational service with a reduced risk of hose failure and improved system performance.


Benefits Delivered

  • Improved hydraulic reliability and operational safety
  • Reduced risk of unplanned hydraulic failures and downtime
  • Creation of a detailed hydraulic hose register for lifecycle management
  • Extended operational life of the crane hydraulic system
  • Improved machine uptime and operational availability
  • Reduced long-term maintenance and repair costs
  • Fully managed turnkey service delivery by Alatas engineers