| Category | Details |
| ALATAS’ SERVICE | Field Service |
| LOCATION | Singapore – Xiamen, China |
| EQUIPMENT | Port-Side Anchor Windlass (W2) |
| BRAND / MODEL | TOWIMOR S.A. / Anchor Windlass (W2) |
| VESSEL | SYNERGY KEELUNG |
Overview
Alatas Singapore carried out the replacement of the forward port-side anchor windlass axle shaft and three sleeve bushings aboard SYNERGY KEELUNG during the vessel’s voyage from Singapore to Xiamen, China.
The scope included dismantling and installation of the axle shaft and sleeve bushings, inspection of the brake bands, alignment checks, lubrication, and equipment assessment. Following the work, measured axle shaft clearance was reduced from 5.6 mm to 1.2 mm.
Background
Alatas Singapore attended the vessel to carry out repairs to the port-side W2 anchor windlass. Before sailing, the service team met with the captain and chief mate to review the job scope, submitted the required documentation, checked tools and consumables, and assisted with their loading onboard.
The repair required removal and replacement of the anchor windlass axle shaft and sleeve bushings. Before the work, the service report recorded significant axle shaft clearance of 5.6 mm.
Alatas’ Solution
Alatas assembled a lifting frame to support the work and secured the anchor chain before lifting the anchor windlass frame and chain lifter. The axle shaft support plate and fasteners were dismantled, and the existing axle shaft was jacked out using a portable hydraulic power unit. The sleeve bushing was then removed, followed by cleaning and buffing of the axle shaft housing.
The vessel-supplied replacement axle shaft was cleaned and prepared for installation. The axle housing greasing point was checked and confirmed to have no blockage within the grease raceway.
Alatas installed two sleeve bushings in the axle housing assembly and one sleeve bushing on the axle shaft. Grease was then applied through the shaft housing assembly greasing point.
Following installation, axle shaft clearance was measured at 1.2 mm, compared with 5.6 mm before the work. The drive gear was also checked and found to be properly aligned and set.
Job Scope
- Conduct onboard coordination, safety briefings, toolbox meetings, and risk assessments.
- Prepare and assemble the lifting frame for the anchor windlass work.
- Secure the anchor chain before lifting the windlass frame and chain lifter.
- Dismantle the axle shaft support plate and fasteners.
- Jack out the existing axle shaft using a portable hydraulic power unit.
- Remove the existing sleeve bushing.
- Clean and buff the axle shaft housing.
- Clean and prepare the vessel-supplied replacement axle shaft.
- Check the axle housing greasing point and grease raceway for blockage.
- Install two sleeve bushings in the axle housing assembly and one sleeve bushing on the axle shaft.
- Install the replacement axle shaft.
- Apply grease through the shaft housing assembly greasing point.
- Inspect and measure the brake bands.
- Check the drive gear alignment and setting.
- Measure axle shaft clearance following installation.
- Dismantle the temporary lifting frame and secure the removed axle shaft.
- Clean and paint surfaces affected by hot work.
Execution & Delivery
The work was carried out during the vessel’s voyage from Singapore to Xiamen, China, with Alatas service attendance from September 7 to 12, 2026.
The repair involved assembly of a temporary lifting frame, securing of the anchor chain, hydraulic removal of the existing axle shaft, removal and installation of the sleeve bushings, installation of the replacement axle shaft, lubrication, inspection, and measurement.
Inspection of the brake bands found them to be within the stated allowable tolerance. The upper brake band measured 11.00 mm, while the bottom brake band measured 14.20 mm. The drive gear was checked and found to be properly aligned and set.
The inspection also identified a bent chain separator. Alatas recommended monitoring its position during operation to assess whether the separator end bar was contacting or placing load on the chain lifter during heaving and lowering and to ensure that the chain was guided smoothly into the chain locker to avoid jamming.
Outcome
The replacement axle shaft and three sleeve bushings were installed during the voyage from Singapore to China. Following installation, measured axle shaft clearance was reduced from 5.6 mm to 1.2 mm.
The axle housing greasing point was checked and confirmed free from blockage, the drive gear was found to be properly aligned and set, and the brake bands were confirmed to be within the stated allowable tolerance.
A full functional test was not performed due to sailing and weather conditions and remained a recommended follow-up action.
Recommendations
- Apply additional grease to the axle shaft after 24–40 working hours to ensure grease is fully distributed throughout the shaft and sleeve bushing greaseway.
- Replace the seized axle shaft stud bolts and nuts: 4 × M36 × 270-8.8-Zn stud bolts and 8 × M36-8-Zn nuts.
- Monitor the bent chain separator during operation and assess whether the separator end bar contacts or places load on the chain lifter during heaving and lowering.
- Monitor the chain separator to ensure the chain is guided smoothly into the chain locker and to avoid chain jamming.
- Complete a full functional test of the repaired anchor windlass.
Benefits Delivered
- Completed the axle shaft and three sleeve bushing replacements during the vessel’s voyage from Singapore to Xiamen.
- Reduced measured axle shaft clearance from 5.6 mm to 1.2 mm.
- Confirmed the axle housing grease raceway was free from blockage.
- Confirmed the brake bands were within the stated allowable tolerance.
- Verified that the drive gear was properly aligned and set.
- Identified the axle shaft stud bolts and nuts requiring replacement.
- Identified the bent chain separator for continued operational monitoring.
- Documented the required follow-up lubrication and full functional testing.
TOWIMOR Anchor Windlass Axle Shaft & Sleeve Bushing Voyage Repair gallery




Before: 5.6mm

After: 1.2mm

Grease point has been checked and cleaned confirms no blockage






Aligned and setting properly

Monitor is advised during operation
Assess if the separator is in contact or acts as load during heaving or lowering