Introduction
Alatas India successfully supported the replacement of a Screw Unloader Vertical Conveyor and Gearbox at Paradip Port, one of India’s busiest bulk handling ports. Reliable equipment performance is critical at this facility to ensure smooth and uninterrupted port operations.
By providing on-site engineering expertise, Alatas India assisted the OEM in completing the upgrade efficiently while minimising operational downtime.
Project Scope
Alatas India provided on-site engineering support during the replacement of the Vertical Screw Conveyor at the IFFCO facility in Paradip.
The work involved supporting the OEM installation team and ensuring the new equipment was installed according to manufacturer standards and operational specifications.
This project highlights Alatas India’s commitment to supporting OEM partners and maintaining the reliability of critical bulk material handling equipment.
Background
As part of scheduled maintenance activities, IFFCO planned the replacement of the Vertical Conveyor Screw, Tube, and Gearbox (CSU) in collaboration with the original equipment manufacturer, Bruks Siwertell.
To ensure the installation complied with OEM standards, Bruks Siwertell appointed Alatas India as the engineering support partner, responsible for providing on-site technical expertise and assisting with the installation of the vertical conveyor and gearbox.
This collaboration demonstrates Alatas India’s capability to support complex maintenance projects within critical port operations.
Alatas Solution
Alatas India deployed a skilled engineering team equipped with the necessary tools and documentation to the DR-IFFCO site at Paradip Port.
After receiving the OEM pre-assembly drawings, the team carried out the following key activities:
- Pre-assembly of vertical tubes, distance tube, top bearing, and safety bearing at the jetty
- Installation of OD/ID halves on the new screw, ensuring all bolts were tightened to the specified torque values
- Preparation and oil filling of the new gearbox
- Removal of existing screws from the vertical tubes and separation of the vertical and horizontal conveyors
- Removal of the inlet feeder, screws, tubes, electrical motors, and gearbox using crane lifting
- Installation of the new gearbox and universal shaft while reusing the existing electrical motors
- Installation of new vertical tubes and screws according to OEM specifications
- Installation of OD and ID bearings and covers
- Measurement and verification of screw clearance to ensure it was within the required tolerances
Following installation, the CSU was successfully tested under both no-load and load conditions, confirming satisfactory system performance.
Outcome
The vertical screw conveyor and gearbox replacement was completed safely and efficiently, in full compliance with OEM standards.
This successful upgrade restored operational reliability and ensured continued performance of the bulk handling system at Paradip Port.
By working closely with the OEM and site teams, Alatas India demonstrated its expertise in heavy machinery maintenance, port equipment support, and complex mechanical installations.